Bosht@lemmy.worldtoProgrammer Humor@programming.dev•Derisking a project 1 year outEnglish
7·
3 months agoI have experience with our PM and BAs throwing draft stories in mid sprint that required PO follow up. So basically a complete waste of time.
I have experience with our PM and BAs throwing draft stories in mid sprint that required PO follow up. So basically a complete waste of time.
Yup this is exactly what I was going to post. Was in the industry for 10 years and call me pessimistic but the second they told me they’d already rebooted I’d check uptime.